Glulam
Glued laminations, workshop section and calculated hardware. From beam to portal, the piece arrives numbered.
We build · Structures · long span
Madercon designs, fabricates and assembles glulam and CLT for halls, long-span roofs and pergolas. The piece leaves the workshop; load-bearing timber stays under cover.
Glulam covers spans framing cannot: indoor pool, hall, shed or a long cantilever. Less weight than steel, dry assembly and a soffit that can stay visible.
We work for the end client and for architects and engineers. We hand over structure ready for the roof package: the beam is not the rain layer.
Actualizado septiembre 2026
Glued laminations, workshop section and calculated hardware. From beam to portal, the piece arrives numbered.
Hall, pool or shed without intermediate columns. Span is glulam; water is the roof above.
Crane, hardware and plumbing with our crew. The roof package follows.
Fewer assembly days and a soffit that can stay visible if design and workshop travel together.
A glulam structure is not improvised on site. It is designed, fabricated and covered.
A load-bearing piece of glued laminations, able to cover long spans with less weight than steel. Designed, fabricated in the workshop and assembled with its own hardware.
Load-bearing timber works under cover. Roof and junctions take water away. An outdoor-visible member gets covering and a protected end.
Halls, indoor pools, large pergolas, long-span roofs and refurbishment strengthening.
Design, fabrication and assembly with our crew. We hand over structure ready for the roof package.