Timber works: Pazo de las Encomiendas
Glulam timber structure around a courtyard

Openings · Málaga · on-site

Job openings

Three openings at Madercon, Málaga: timber systems architect, structure erector (min. 5 years) and project manager / architectural technician (min. 10 years in general construction, with qualification). On-site. Apply with the form on this page.

Updated September 2026

Málaga · on-site · studio and works

Architect · Engineering and development of sustainable modular systems

Engineering, architecture and modular timber systems. Workshop, junction detail and real works — not a render studio without a plot.

  • Modular systems: CLT, glulam or framing, from detail to fabrication and assembly.
  • Documentation of joints, tolerances and junctions that take water away.
  • Spanish; technical English valued.

Málaga · on-site · workshop and plot · min. 5 years

Timber structure erector

Structure assembly in the workshop and on site: CLT panels, glulam and framing. Load-bearing timber works under cover.

  • At least 5 years erecting timber structures, not finish carpentry only.
  • Reading assembly drawings, levels, anchors and roof junctions.
  • Travel to works in Andalusia and Spain, based in Málaga.

Málaga · on-site · min. 10 years · qualification

Project manager · Architectural technician

Site management and trade coordination in general construction. Building craft, not only on-screen planning.

  • At least 10 years in general construction (building, not only minor refurbishment).
  • Architectural technician, building engineering or equivalent.
  • Programme, quantities, Spanish building code and Madercon’s timber system.

← Work with us

Send application

Choose the role