Thermal insulation
Timber cuts the thermal bridge. Summer comfort is finished by insulation and roof ventilation.
We build · Roofs · under cover
On Madercon roofs, load-bearing timber is not left in the rain. Water is resolved outside — cladding, membrane and, if the system asks, a ventilated cavity — and the beam works dry.
We fabricate and assemble timber roofs for houses and buildings, new-build and refurbishment. Timber gives insulation and an eave that is architecture; it is not the rain layer.
The package is sized for Málaga and Andalusia. Gutters, valleys and flashings are sheet metal or a dedicated piece, never a bare timber edge.
Actualizado septiembre 2026
Timber cuts the thermal bridge. Summer comfort is finished by insulation and roof ventilation.
The package is closed so rain noise does not reach the interior.
Eave and soffit seen from below. The rain face is cladding; the room face can be timber.
Workshop and fewer crane days. Price holds if the water package is right first time.
A timber roof lasts if water never reaches the structural section. That is the rule, new-build and refurbishment.
| Works | New-build and refurbishment |
|---|---|
| Climate | Málaga and Andalusia: summer heat, occasional rain |
| Rule | Structural section under cover |
No. The beam is not the rain layer. Cladding, membrane and junctions take water away; the structure works dry.
Structure, deck, membrane, batten and cavity if ventilated, and cladding. Gutters and valleys in sheet, not bare timber.
Yes. We build new roofs and refurbish existing packages. The rule does not change: timber does not take the water.
Timber helps, but summer is the package: insulation, ventilation and cladding. We size it to climate, not only the eave.