System
We study which parts of the project to prepare in a workshop and which to complete on site. The system is chosen around the design, access, suppliers and available resources.
Starting from the project design and specification, we coordinate these steps with the project specialists, manufacturers and contractors:
- Detailed design to the client brief
- Adaptation of parts to fabrication systems
- Factory production of structures, pods and panels
- Logistics, packing and transport to site
- Assembly to an agreed sequence, resources and checks
What we review before choosing the system
Quality and junctions
- Factory quality control
- Review of details, tolerances and assembly
Costs
- In production
- In site assembly
- Cost comparison based on system, logistics and project scope.
Logistics
- Plan the work carried out in the workshop
- Define protection and packing for transport
- Organise access, storage, assembly and waste management
Efficient
Fabrication and assembly planning with the suppliers for each build. Timing and constraints are agreed before contracting.
Global market
Projects beyond our usual area are assessed against logistics, regulations and available collaborators.
Environmental criteria
- Review material origin and documentation
- Compare material and finish alternatives
- Plan cutting layouts to make use of the material
- Include maintenance and service life in the study
Systems and working plans: models. Developments: eco-resorts.